Ontario Place was an entertainment venue, event venue, and park in Toronto, Ontario, Canada. The venue is located on three artificial landscaped islands just off-shore in Lake Ontario, south of Exhibition Place, and southwest of Downtown Toronto. It opened on May 22, 1971, and operated as a theme park centred around Ontario themes and family attractions until 2012 when the Government of Ontario announced that it would close for redevelopment. It has since reopened as a park without an admission fee but without several of the old attractions. The Government of Ontario has made controversial plan to place the 145 acres on a 95-year lease with the Swiss mega-spa builder Therme Group without public consultation or environmental assessments.
Since the closure as a theme park, several of the venue's facilities have remained open, once reopened, and one section was redeveloped. The Budweiser Stage operates during the summer season. The Cinesphere, the original IMAX theatre, reopened with new projection equipment and shows films regularly; although it is currently closed for renovations. On the East Island, Trillium Park and the William G Davis Trail opened in 2017. A marina, sheltered by three sunken lake freighters operates seasonally at the site. The exhibit "pods", several pavilions suspended above a lagoon, have remained closed after the closure of the Atlantis event facility. While much of the West Island's facilities are permanently closed, some of the natural spaces are now being used for recreation. Occasionally special events are hosted in the west island village.
The park itself was originally conceived as an onshore exhibit, but this idea was discarded in favour of five large, architecturally unique, three-level pods in an aquatic setting somewhat similar in concept to Montreal's Expo 67 grounds (which were in the middle of the Saint Lawrence River). Each pod would be approximately in area, and suspended by steel cables from four large central pylons driven deep into the lake bed. These pods initially housed various Ontario-themed exhibits. The first model displayed to the government dismayed director Jim Ramsay:
The original plans were estimated to cost to construct. Plans for the facility grew to include the Forum outdoor amphitheater, marina, nine restaurants, nine snack bars, three land rides, pedal and tour boats and an additional of landfill.
During the design phase, a difficult design problem developed. The cost of the open-water pod foundations alone (at the time, estimated at ) would consume almost the entire budget for the pods' construction. Architect Eb Zeidler was faced with a dilemma: how to construct the pods without the necessary budget. Zeidler developed an innovative solution: after a trip to the Caribbean, he realized that a "barrier reef" concept would cut down on wave action from the lake enough to reduce the cost of the pods' foundation to 1/10 of the original open-water estimate. After some quarrels with the Toronto Harbour Commission (due to the dangers of the unseen reef to shipping), the reef plan was modified to incorporate three artificial "barrier islands" made from city landfill.
The five steel and aluminum pavilion pods are square with sides. Each pod is supported by four pipe columns, rising above the lake. Tension cables support the short-span trusses. They sit on concrete filled caissons, driven into the lake's bedrock. Each of the pavilions is connected to one another and the land by glazed steel bridges. Ontario Place was designed to have a modular use and appearance. Zeidler says that the structures were designed to "give an illusion of dimensionless space, exploiting technology to shape the society of tomorrow".
The Forum, an outdoor concert venue, was featured on a central hub-island, while a children's village would occupy an eastern island. A commercial section overlooked the water, with modular construction for shops and restaurants to the west. All would be connected by an intricately planned set of walkways and bridges. In addition, each island would have a unique colour scheme, and the entire complex was later infused with the brilliant colours and graphic design that was typical of the late 1960s and early 1970s. The children's village was designed by Eric McMillan and cost $700,000.
The Forum theatre sat 3,000 and had additional grass 'seats'. The roof structure was a hyperbolic paraboloid positioned on cement bastions. It covered a revolving stage, giving near 360 degree sightlines. The roof was made out of tongue and groove plywood, covered by copper sheathing.
Landscape architect Michael Hough overlaid a scale model of the University of Toronto's walking paths onto the Ontario Place plans to check for appropriate walking distances. This ensured that comfortable rest areas were placed appropriately so that children and the elderly would not need to walk too far without a comfortable seat. Ontario Place operated a rubber-wheeled tractor train and a boat to take visitors between key points on the various islands.
Prevailing wind and wave conditions were also considered in the design, a scale model of which was tested in the University of Toronto's wind tunnel. Large earthwork planted with tall native Ontario trees were created to shelter walkways from the prevailing southwesterly winds. To the south, a cost-effective and theme-congruent plan to sink three large obsolete Lake freighter was implemented, which sheltered the artificial harbour from intense open-lake waves. (The same technique would later be used on Toronto Island and the Outer Harbour.) The first phase of construction was the sinking of the ships onto a stone bed, then covered in concrete forming a long breakwater. Once the perimeter was finished, work began on the of the three artificial islands.
A marina was included in the project, holding up to 292 boats up to in length. There was originally some controversy about allowing a public facility to house an upscale boating dock within the new artificial harbour. Supporters of the plan believed that the dock's integration into Ontario Place would tie the location closer to the lake via boating activity, and improve the general ambience.
At Expo 70 in Osaka, Japan, the new IMAX movie technology was first exhibited. A great success, it was decided to build the first permanent IMAX installation at Ontario Place. The Cinesphere, an 800-seat theatre, was built. Its building is a 'spherical triodetic dome', with a outer radius, and a inner radius. The dome is supported by prefabricated steel aluminum alloy tubes.
The design of Ontario Place has won a long list of awards including ones from the International Committee for Documentation and Conservation of Buildings of the Modern Movement, the Royal Architectural Institute of Canada, The National Trust — Prix du XXe Siècle, and the American Society of Landscape Architects. In 2014, the Ontario government's Ministry of Culture, Tourism and Sport declared Ontario Place to be a "cultural heritage landscape of provincial significance".
To commemorate the opening of the theme park and promote the province of Ontario, a multi-media exhibition was created and presented inside the pavilion. Dolores Claman wrote the music and Richard Morris wrote lyrics for the music to this presentation, entitled "Theme from Ontario Place". "Theme from Ontario Place" was subsequently released by the Ontario Department of Trade and Development as a double-sided 45RPM vinyl record. It was manufactured by Quality Records (OP1971), side A containing a "Pop" version and Side B an "Easy Listening" recording. A photo of the still under construction Ontario Place was used on the cover. The purpose-built Imax theatre premiered a specially commissioned film North of Superior, an 18-minute film depicting life in Northern Ontario and its first season over 1.1 million people viewed the film.
In its first year, attendance was 2.5 million. The park had higher than expected costs and ran a deficit of $2.2 million. Winter screenings at Cinesphere were "financially successful". The Government of Ontario raised the admission from $1 to $1.50 for adults and 50 cents to 75 cents for youth. Manager James Ramsay was replaced and returned to the Ministry of Trade and Development. Two government-run restaurants that had lost money were leased to a private operator for the second season. During the first year, visitors to the CNE had to pay admission to enter Ontario Place. Starting in the second year, admission to the CNE included free admission to Ontario Place.
In 1980, the "Ontario North Now" exhibit was built on the west island to showcase Northern Ontario. It was a combination of inter-connected silo-like buildings, topped with domes reminiscent of the Cinesphere, connected by overhead walkways, and a smaller domed movie theatre. In 1984, a boat-based water ride was added, along with a smaller exhibition center consisting of three concrete silo-like buildings. A large reflecting pool nearby was drained and used to house the addition of a major "climber" structure, a smaller stage for kids shows and several other kid-oriented attractions, reducing the complete separation of areas that had been featured in the original design.
The outdoor in-the-round concert stage, The Forum, was torn down and replaced with the million Molson Amphitheatre in 1995, a much larger facility based on a bandshell design. An additional "Echo Beach" outdoor music venue was added to the north shore of the east island in 2011.
On the east island, the original children's area, which was primarily "non-powered", has largely been removed. The large wood-and-rope climber area was replaced with the large "Soak City" waterpark, the first water park in Ontario. Several small fair-ground rides were later added. The large tension structure tent that covered most of the children's park was removed in 2009/10, leaving a large open area with a new stage. Many of the concrete bollards used to secure the various tents and structures can still be seen.
Attendance was another concern for park management and new attractions were regularly introduced to gain new interest. Attendance declined from 3 million annually in the 1970s, to 2.5 million in 1985, 2.1 million in 1989. By 2004, attendance had declined to one million annually. The Ontario Government appointed former Toronto Mayor David Crombie to revitalize the park. In its last summer operating season, attendance was 563,000.
When the Ontario Gaming Commission was proposing a casino in downtown Toronto in 2012, one site mentioned was Ontario Place as a solution to declining attendance and revenues. The downtown casino was eventually stopped by opposition at Toronto City Council. The casino idea was also opposed by border cities in Ontario with existing casinos.
Investments were made in entertainment, marketing and sponsorship for the 40th-anniversary celebrations. Free grounds admission was offered to the public for the first time in 20 years. Live entertainment performances were quadrupled, to over 2,000. Advertising was reinstated, with a new ad campaign developed by Draft FCB of Toronto. A significant sponsorship of the 40th birthday celebration by CTV generated over $1,500,000 in extra advertising value. Ontario Place was recognized in 2011 by IAAPA as a worldwide finalist for a "Brass Ring Award" in the category of "Best Integrated Marketing Campaign".
The results of this effort generated an improvement in attendance numbers, park revenues, and public perceptions of Ontario Place in 2011. Total park attendance increased 9% to 880,001 despite a below average year for concerts at the Molson Canadian Amphitheatre and a decline in cross-over attendance from the Canadian National Exhibition. Core park attendance increased by 72% to 563,362. First-time visitor attendance increased even more, at 89%. Revenues in all categories increased by double-digit figures, despite the fact that there was no charge for actual admission to the grounds.
Scores from interview-based research into visitor perceptions also improved strongly. Favourable response to the question, "Ontario Place has changed for the better", increased by 43%, as did, "Ontario Place is my favourite entertainment park in the GTA", at 50% up. Perceptions of park cleanliness and general upkeep improved, by 34% and 37%, respectively.
On February 1, 2012, the government announced that the public sections of the park would be closed and redeveloped, with a target date of 2017, the year of Canada's 150th anniversary. John Tory was announced as the chair of a Minister's Advisory Panel on Revitalization. All Ontario Place facilities were closed except for the marina, the Molson Canadian Amphitheatre, the Atlantis entertainment venue and parking.
Following the provincial elections in June 2014, the government announced the plans in July for Ontario Place to be developed as an urban parkland with Molson Canadian Amphitheatre, Cinesphere and the pods retained.
The West Channel at Ontario Place was a venue for the 2015 Pan American Games (Athletics -marathon/race walk, cycling (road race), triathlon (cycling/run), open water swimming, triathlon (swim), water skiing and 2015 Parapan American Games (Cycling)). Minor and temporary upgrades were made to accommodate use during the games. Construction was begun in March on the park and a waterfront path, which was named the William G. Davis Trail, after the Ontario premier who opened the original Ontario Place in 1971.Bradbeer, Janice. "Will this lakeside gem glisten again?". Toronto Star, May 15, 2016. page IN7
In 2017, portions of the East Island were transformed from a parking lot into Trillium Park. The new park included the William G. Davis Trail, which opened in June 2017. In November 2017, the Cinesphere re-opened with showings of Dunkirk and North of Superior as part of a regular schedule of weekend programming. The Cinesphere's screen was replaced and a new "IMAX with laser" projector was installed.
In early 2018, the Government of Ontario led by Liberal Premier Kathleen Wynne solicited proposals as to new purposes for Ontario Place, but those could not include condominiums or a casino. After the Progressive Conservatives were elected in June, an announcement was made of plans to dissolve the Ontario Place Corporation. This follows the province indicating interest in establishing a casino on the lands. In November, Finance Minister Vic Fedeli suggested that the government was open to considering a new purpose for the park, without the restrictions that had been set by the previous government.
In December 2018, the Government of Ontario appointed James Ginou, a Toronto businessman and Progressive Conservative fund-raiser, as the new chair of the Board of Ontario. He had previously served in the position from 1997 until 2003. In 2019, the Government of Ontario announced that it would develop a rapid-transit line (the "Ontario Line") connecting Ontario Place to downtown Toronto and further north-east to the Ontario Science Centre. The line is targeted to open in 2027.
In May 2019, at an announcement held in the Cinesphere, the Government of Ontario released a call for proposals to redevelop Ontario Place with "big, bold ideas". Proposals must not include residential units, a casino and must not require a specific monetary outlay or subsidy by the Government of Ontario. Proposals must preserve the existing amount of parkland included in the Trillium Park, preserve the existing Budweiser Stage, but otherwise permit any type of changes, subject to approval.
Also in May 2019, Toronto city council voted 25–0 to list Ontario Place on Toronto's heritage property register. The listing does not offer any legal protections.
World Monuments Fund included Ontario Place on its 2020 World Monuments Watch program alongside 24 heritage sites around the globe “in need of timely or urgent action”. In response to the Province of Ontario's international call for development proposals, the WMF listing demanded “an end to top-down decision-making and the embrace of heritage to encourage community dialogue”. Following the Watch inclusion, World Monuments Fund partnered with the Architectural Conservancy Ontario and the Faculty of Architecture, Landscape and Design at the University of Toronto to protect the heritage values of Ontario Place through an initiative called "The Future of Ontario Place Project". Through a research initiative, design challenge, and public campaign, the Future of Ontario Place Project started working in 2020 to build public knowledge of the heritage values of the site, and to imagine the future of Ontario Place as a public cultural asset for all Ontarians.
A third company proposed to build a zip-line and adventure park but pulled out of the project. The company and the government could not come to terms on the lease.
Private sector investments are expected to be about $500-million. Public sector investment was not disclosed. A review process for environmental, heritage, and public consultation, will likely extend into 2023. Construction is scheduled to begin in 2024, with a 2030 completion.
In February 2022, Toronto city council voted to adopt a process to create an approvals process for the Province's plan for the redevelopment of Ontario Place. This process generally follows the city's traditional development approvals process, notwithstanding Ontario Place is predominately constructed on Provincially-owned land. Based on this timeline, a rezoning application is expected in late 2022 and a site plan approvals process began in 2023.
The Cinesphere was closed for renovations. In September 2022, the ministry reported: “Repair work on the Cinesphere, pods, and bridges is proceeding on-schedule this fall. Site servicing, including sewage, water, electrical, and gas, is expected to begin in the spring of 2023."
Therme Canada's local partners are the Toronto International Film Festival (TIFF), Mississaugas of the Credit First Nation, Black North Initiative. TIFF later 'paused' their relationship with Therme ahead of their 2023 festival. Other partners include AECON Group Inc., Diamond Schmitt, and Studio TLA. Strategy Corp, is serving Therme Canada with strategy and communications. Formerly, Swim Drink Fish Canada was a partner, but has exited the partnership in the belief that the government's portion of the plan is "simply too opaque and controversial for us to support". Swim Drink Fish Canada, swimdrinkfish.ca. Accessed July 14, 2023.
Therme's plans have received strong public backlash, with the group Ontario Place for All leading the campaign against the development. Plans to develop the public space and existing beach by a for-profit private developer became a prominent 2023 election issue in Toronto. The mayoral campaign saw mayor Olivia Chow come out in opposition to the project. Later in 2023, she dropped her opposition to the project when the City and Government of Ontario reached an agreement for the transfer of the two Toronto freeways (Don Valley and Gardiner) to the province, saving the city an estimated $1.2 billion. The community group has continued its opposition, attempting to stop or slow down the project in the courts.
The Ford government has proposed to move the Ontario Science Centre to the site. It would sit atop a large parking garage that would serve the Therme spa. The Centre would also incorporate the pods as exhibit space, and the Cinesphere. The proposed move has been controversial.
The park is profiled in Ali Weinstein's 2024 documentary film Your Tomorrow.Phoebe Knight, "Movie about Ontario Place getting world premiere at TIFF". BlogTO, August 12, 2024.
Trillium Park is a newly developed park on the East Island. The park provides a trail, a firepit, a picnic/meeting shelter and some special plantings.
While not full redeveloped, one area of the West Island has been repurposed. It is used for cultural festivals and events. A skating rink operates during winter months and boat rentals operate during the summer months.
Featured events included an annual Toronto Symphony rendition of Tchaikovsky's 1812 Overture, complete with the firing of the guns from the nearby HMCS Haida, and often performances by well established acts, such as B. B. King, Peter Tosh, Glen Campbell, Kenny Rogers, Johnny Cash, James Brown, Dizzy Gillespie, Jan & Dean, Pat Metheny, Blondie, Chic T, KC and the Sunshine Band and Canadian acts like Burton Cummings, Lighthouse, Bruce Cockburn, The Nylons, Luba, Men Without Hats, The Box, Doug and the Slugs, Parachute Club, Red Rider and Strange Advance. Unfortunately, due to a riot by Teenage Head fans in 1980 (purportedly instigated by their manager, who allegedly was interested in the publicity) harder rock acts were thereafter banned from the venue. In summer of 1983, the Forum was ahead of the curve by bringing in acts like Paul Young and the Royal Family and Tina Turner just before her huge comeback the following year.
The Forum was torn down at the end of the 1994 season. According to Lou Seller, the Ontario Place marketing and entertainment manager, the decision was made because "the Forum is quaint. It could not take big acts. The sightlines will be better, the acoustics will be better, we'll be able to offer a state-of-the-art concert experience." Sellers also said that Ontario Place was looking forward to an increase in attendance at the park, which cost the provincial treasury $4.5 million annually, 30% of its budget, an amount it wanted to decrease. The plan was criticized by the original Ontario Place architect Eb Zeidler, who suggested building the facility on the east island so as to keep the Forum, which he described as an engineering achievement that should be kept, and Ontario Place's landscape architect Michael Hough who criticized the cutting of trees necessary for the new facility. The plan was met with protests at Toronto City Hall, but the City of Toronto Council did not stop the project. The project was paid for by Molson Breweries and MCA (today's Live Nation).
Ontario Place was also used for the filming of Urban Legends Final Cut as the "Tunnel of Terror" back in 1999. This scene shows the ride turned into a horror ride where two of the characters are killed by electrocution but the authorities believe it to be accidental.
It was used in first-season episode "Ghosts of Illyria", doubling for exterior shots of the abandoned Hetemit IX colony.
|
|